Yong Xing Boiler Group Co.,Ltd

Yong Xing Boiler Group Co.,Ltd Service customer with profession

Manufacturer from China
Active Member
7 Years
Home / Products / Steam Boiler Economizer /

Carbon Steel Furnace Economizer In Boiler Quick Installation For Petrochemical

Contact Now
Yong Xing Boiler Group Co.,Ltd
City:zhoukou
Province/State:henan
Country/Region:china
Contact Person:MsBettysun
Contact Now

Carbon Steel Furnace Economizer In Boiler Quick Installation For Petrochemical

Ask Latest Price
Video Channel
Brand Name :YONGXING
Model Number :DZL/SZL type
Certification :ISO,CE
Place of Origin :JIANGSU
MOQ :1set
Price :negotiable
Payment Terms :T/T, L/C, Western Union
Supply Ability :1000sets/Year
Delivery Time :7 working days
Packaging Details :Nude packing
Materials :Cast iron
Application :Heater, Vaporizer
Matching Boiler :10T
Tubes :Finned tube
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Latest Technology environmental low price boiler economiser in boiler with Carbon Steel

The boiler economizer generates hot water, hot air and steam by heating water or air, which not only saves boiler fuel, improves energy utilization, but also effectively reduces operating costs.

boiler economizer cost Features

1. Quick installation, heat recovery, high temperature corrosion resistance, long service life, improved thermal efficiency, customizable processing, easy to clean.

2. Simple operation and maintenance, saving labor and high automation level.

3. Energy saving, absorb heat from low temperature flue gas, reduce exhaust gas temperature, reduce smoke loss and save fuel.

4. The space is compact, the overall weight is greatly reduced, and the cost is reduced.

Boiler economizer cost Applicable industry

It is widely used in petrochemical, building materials, textile, metallurgy, power, food, paper, electronics and other industries.

Advantages

1. Quick installation, the overall assembly of the economizer is factory, the moving parts are few, the structure is simple and easy to install.

2. Can be recycled to improve thermal efficiency.

3. High temperature corrosion resistance, increase the cross section of the smoke flow, reduce the smoke speed and less wear.

4. Install professional gaskets and screws to prevent smoke and water from leaking.

5. The finned tubes of the economizer can be combined at will, and the quantity can be determined by the customer.

Boiler economizer cost Data sheet for reference :

Boiler capacity Economizer model Working pressure
(Mpa)
Finned tube size
(mm)
Finned tube qt'y
(pcs)
Finned tube diameter (mm)
2t/h L1000-1.6-¢50*24 1.6 1000 24 50
2t/h L1000-1.6-¢50*32 1.6 1000 32 50
4t/h L1000-1.6-¢50*36 1.6 1000 36 50
4t/h L1000-1.6-¢50*48 1.6 1000 48 50
6t/h L1500-1.6-¢60*60 1.6 1500 60 60
8t/h-10t/h L1500-1.6-¢60* 80 1.6 1500 80 60
15t/h L1500-1.6-¢60*120 1.6 1500 120 60
20t/h L2000-1.6-¢60*120 1.6 2000 120 60
20t/h L2500-1.6-¢60*100 1.6 2500 100 60
25t/h L2000-1.6-¢60*160 1.6 2000 160 60
25t/h L2500-1.6-¢60*120 1.6 2500 120 60
25t/h L2500-1.6-¢60*160 1.6 2500 160 60

Carbon Steel Furnace Economizer In Boiler  Quick Installation For PetrochemicalCarbon Steel Furnace Economizer In Boiler  Quick Installation For PetrochemicalCarbon Steel Furnace Economizer In Boiler  Quick Installation For Petrochemical

Inquiry Cart 0